From ESS News
14 massive battery storage programs (BESS) have come on-line in Sweden to deploy 211 MW / 211 MWh within the area.
Developer and optimizer Ingrid Capacity and power storage owner-operator BW ESS are working collectively to ship 14 massive BESS initiatives throughout the Swedish grid, positioned in electrical energy worth areas SE3 and SE4.
The connection to the grid was managed at the moment by the Swedish minister for local weather and the atmosphere, Romina Pourmokhtari. Among his remarks on the ceremony, Pourmokhtari mentioned:
“It is a good honor to inaugurate the biggest power storage funding within the Nordics, with 211 MW now linked to the electrical energy grid.
To proceed studying, please go to our ESS News web site.
This content material is protected by copyright and will not be reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].