Top Cable, a Catalan cable manufacturing firm, has introduced that it’s now totally using all of the photovoltaic power produced by the six installations unfold throughout its manufacturing vegetation. These installations collectively have 20,000 photovoltaic modules.
By 2024, Top Cable expects to generate 11 GWh of photovoltaic power, equal to virtually 20% of its complete power consumption. The firm’s headquarters in RubÃ, Barcelona, ​​has greater than 4,500 photo voltaic panels in two warehouses, with a mixed capability of two MW and an annual power manufacturing of two,490 MWh, carried out by Eidf Solar from Madrid.
At its services in Sallent in Barcelona, ​​Top Cable has put in greater than 10,500 photo voltaic panels in three warehouses, with a complete capability of 4.2 MW and producing 4,779 MWh per 12 months. In Bellpuig, Lleida, a warehouse roof hosts 3,208 photo voltaic panels that produce 1.3 MW and 1,516 MWh per 12 months.
In addition, the Binaced undertaking in Huesca continues, with 696 photovoltaic modules that presently generate 600 kW of power. The set up is deliberate to succeed in 842 kWp to maximise effectivity.
This initiative highlights Top Cable’s dedication to sustainable power practices and can considerably scale back its carbon footprint in its operations.
Relevant