Construction of Liberia’s first utility-scale photo voltaic plant has begun.
The 20 MW facility is being inbuilt Harrisburg, a district of Montserrado county, on the positioning of the 88 MW Mount Coffee Hydropower Station. Local press experiences point out that the challenge has a scheduled completion date of August 2025.
This is the primary of many deliberate photo voltaic and hydro initiatives geared toward strengthening Liberia’s vitality capability, in accordance with a Liberian authorities assertion.
President Joseph Nyuma Boakai Sr. attended the groundbreaking ceremony. He mentioned the photo voltaic challenge will assist clear up Liberia’s energy scarcity, particularly through the summer time, when water ranges drop and hydroelectric manufacturing declines.
The World Bank dedicated grant funding for the challenge below its Regional Emergency Solar Power Intervention Project. At the ceremony, the president additionally thanked the African Development Bank, European Union, European Investment Bank, US authorities, Japanese authorities, German state-owned improvement financial institution KfW, and West African Power Pool for his or her assist and contribution.
“The authorities can not do that alone,” he mentioned. “We want the collaboration of our improvement companions and the lively participation of the non-public sector, together with Liberian companies.”
Liberia will set up 3 MW of photo voltaic by the tip of 2023, in accordance with figures from the International Renewable Energy Agency (IRENA).
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].