Colombian President Gustavo Petro

With the participation of the president of Colombia, Gustavo Petro, the minister of power and mines, Andrés Camacho Morales, and different authorities, the Spanish power firm Zelestra formally inaugurated the 144 MW La Unión photovoltaic plant , situated in Montería, situated within the division of Córdoba.

The plant, which was formally related to {the electrical} grid final June, consists of greater than 220,000 photo voltaic panels, and represents an funding of greater than $200 million, in response to the corporate. The mission created 1,276 native jobs throughout its development.

IDB Invest and Bancolombia introduced an settlement in November final yr to finance two photo voltaic tasks by Zelestra, previously generally known as Solarpack, the aforementioned La Unión and the 108 MW La Mata photo voltaic mission, which giving a complete of $134.5 million.

Solarpack is without doubt one of the firms awarded tasks within the final long-term renewable power public sale in Colombia for a complete of 1,123 MWh/day, the place 15-year contracts have been closed with a weighted common value of allocation of 155.8 pesos/kWh ($0.041/kWh). ).

This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].

Popular content material