the European Commission despatched a letter of formal discover to 26 of its member states for failing to transpose the provisions of the revised states. Renewable Energy Directive (RED) to nationwide legislation.
The revised RED comes into power in November 2023. It requires a number of provisions, together with measures to simplify and pace up the authorization procedures for renewable power initiatives, to be transferred into nationwide legislation originally of July 2024.
The provisions embrace simplified authorization for infrastructure that provides renewable power to the electrical energy system, clear closing dates for granting authorization, a strengthened function for some extent of contact for of purposes, and an assumption that renewable power initiatives and associated grid infrastructure serve the general public curiosity.
The European Commission reported that solely Denmark introduced the total transposition of those provisions on July 1, prompting infringement procedures in opposition to all different states. The fee mentioned every nation has two months to reply and full their transposition. It added that if there is no such thing as a passable reply, it might “determine to subject a reasoned opinion.”
This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].