SPPC launched the sixth section of the Saudi Arabian authorities’s National Renewable Energy Program (NREP). It has issued an RFQ relating to 3 GW of photo voltaic capability in 4 tasks.
One facility has a capability of 1.4 GW (AC) close to Hima in Najran province, along with a second 600 MW (AC) plant close to Ad Darb, Jizan province. SPPC additionally intends to assign a 600 MW (AC) mission deliberate in Jazan and a 400 MW (AC) mission close to Al Sufun, Hail province.
The chosen builders should develop and assemble the services on a build-own-operate (BOO) foundation. They have till October 15 to pre-qualify the tender.
In February, the SPPC revealed the chosen bidders for the fifth section of the scheme, which goals to allocate 3.7 GW to 4 tasks.
The tendered PV vegetation embrace the two GW (AC) Al Sadawi plant in jap Saudi Arabia, the 1 GW (AC) Al Masa’a mission in northern Hail province, the 400 MW (AC) Al Henakiyah 2 plant in western Madinah province. , and the 300 MW (AC) Rabigh 2 array within the western province of Makkah.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].