From pv journal Brazil
Brazil’s Ministry of Mines and Energy has introduced plans to open a public session for a capability reservation public sale targeted solely on battery storage, scheduled for 2025.
Energy Minister Alexandre Silveira mentioned that, together with this public sale, the federal government additionally plans to carry a beforehand scheduled public sale in 2024 for reserve capability from thermal and hydroelectric sources. He mentioned the aim of the battery public sale is to develop battery expertise in Brazil and entice main producers akin to Huawei from China and different nations.
Silveira famous the significance of utilizing batteries to help distributed sources of power, akin to wind and photo voltaic, with out speeding the method or overloading shoppers. He mentioned the federal government’s precedence is to scale back power prices and guarantee power safety, regardless of the strain to speed up initiatives.
The minister admitted that Brazil has sufficient power contracted to satisfy the demand, even with extreme drought. He advocated the activation of thermal energy crops to offset the decline in hydroelectric era.
“We have sufficient contracted power,” Silveira mentioned, noting that future auctions goal to ensure power safety for the following six to seven years.
Silveira added that Brazil’s power demand is rising because of the results of the local weather, which reveals the necessity to double the nation’s thermal energy capability by the 12 months 2031. He additionally requested a contingency plan to take care of the steadiness of the system of summer time months.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].