From ESS News
China’s GCL Group has formally launched the development of a 2.4 GWh pumped hydro storage plant in Jiande City, Zhejiang Province, billed as the most important single clear power challenge invested and constructed by the group and the most important pumped storage challenge in East China till now.
The EPC contract signing ceremony was held on September 8 and was attended by representatives from Zhejiang Jiande GCL Pumped Storage Co., Ltd. (subsidiary of GCL Group and funding entity of the challenge), Huadong Engineering Corporation, PowerChina SOCOL Corporation, and officers from Jiande Municipal Government.
Located in Linchang Town in Jiande City, Zhejiang Province, GCL Pumped Storage Power Station is within the energy consumption middle of Zhejiang and near Shanghai. With a complete funding of practically CNY12.5 billion ($1.76 billion), the challenge is predicted to start out producing electrical energy earlier than 2030.
When accomplished, the ability station could have six reversible water turbine generator models with an influence of 400 MW every. It is predicted to generate a median annual energy output of two.52 TWh.
To proceed studying, please go to our ESS News web site.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].