From pv journal Australia
The proposed 4.5 GW Central-West Orana REZ transmission venture, positioned 350 kilometers northwest of Sydney, has obtained planning permission from the Australian authorities.
The announcement follows the New South Wales authorities’s choice to grant planning permission in June 2024. Construction is scheduled to start in late 2024, with preliminary operations deliberate for 2028.
The Energy Corporation of NSW (EnergyCo), tasked with delivering the NSW REZs, will now award a ultimate contract to the chosen community operator to design, construct, function, and preserve the transmission community.
EnergyCo CEO James Hay stated securing planning approval for the transmission venture was a key step in progressing 12 GW of technology beneath the New South Wales Electricity Infrastructure Roadmap (EIR) and transferring in direction of a clear power future in New South Wales.
“This is the primary REZ within the nation to realize full planning approval, paving the way in which for a major enhance in renewable power technology to exchange ageing coal-fired energy stations,” stated Hay. “The Central-West Orana REZ will not be solely about clear power. This venture will carry long-term monetary advantages to each [New South Wales] electrical energy customers and the native communities the place the REZ shall be constructed.”
Image: EnergyCo
To proceed studying, please go to our Australia’s pv journal web site.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].