From ESS News
SSE Renewables has introduced plans for a brand new pumped storage hydropower scheme at Loch Fearna in Scotland’s Great Glen, in a 50:50 growth three way partnership with a consortium led by UK-based hydropower mission growth specialist Gilkes Energy.
The 1.8 GW/ 37GWh Fearna Pumped Hydro Energy Storage (PHES) mission has already secured a grid connection supply amounting to 1,795 MW. The mission envisages the event of tunnels and a brand new energy station connecting SSE Renewables’ current reservoir at Loch Quoich with an higher reservoir at Loch Fearna.
A request for a scoping opinion for the mission is now earlier than Scottish Government ministers and session has begun with native communities and organisations. The promoters of the mission hope that the event will attain industrial operations within the mid-2030s, topic to reaching a last funding choice.
Earlier this 12 months, the UK Government consulted on its choice to implement a cap and flooring funding framework for long-term electrical energy storage together with pumped storage hydro. The end result from the session is predicted by the tip of 2024, with the primary utility window for the initiatives probably opening in 2025.
To proceed studying, please go to our ESS News web site.
This content material is protected by copyright and is probably not reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].