ZNShine Solar mentioned it has submitted an software to the China Securities Regulatory Commission (CSRC) to problem H-shares and record them on the HKEX. The firm, based in 2006, operates three factories in China with a complete capability of about 10 GW. It plans to increase additional into China and Indonesia.
GCL SI mentioned it expects income between CNY 7.8 billion ($1.07 billion) and CNY 8.5 billion for the primary half of 2024, up 39.15% to 51.64% year-on-year. The firm expects a internet revenue lower of 53.38% to 64.14%, from CNY 40 million to CNY 52 million, as a result of lower in product costs and elevated competitors. Despite this, it says that it has recorded a better quantity of cargo and revenue as a result of efficient value of manufacturing of cells and modules.
Datang Corp. mentioned it has launched a young for PV inverters for the 2024-25 interval. This consists of 12 GW of high-power string inverters, 3 GW of centralized inverters, and 1 GW of distributed string inverters. Bids will open on August 6, 2024, and deliveries will final till June 30, 2025.
China Huadian Corp. mentioned it’ll quickly begin constructing a 3.5 GW hydro-solar undertaking on the higher reaches of the Jinsha River in Sichuan. The undertaking, the biggest renewable power initiative within the province, consists of three photo voltaic installations: 1.6 GW in Dayi, 700 MW in Larung, and 1.2 GW in Zhongzan. The arrays will work in tandem with an upstream hydropower base.
This content material is protected by copyright and is probably not reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.