Friday, December 6, 2024

Don Humberto Park in Til-til Achieves Energy Synchronization Milestone, Combining 80 MW Photo voltaic Capability and 67 MW BESS

-


The park of Don Humberto, positioned within the commune of Til-til within the Metropolitan area of Chile, has efficiently achieved the primary synchronization of vitality with the National Electric System. This milestone marks a major step for the park, which mixes an 80 MW photo voltaic vitality capability with a 67 MW Battery Energy Storage System (BESS).

growatt_inside_april

Enel Green Power Chile introduced that Don Humberto is the second hybrid unit within the area to attain this essential milestone.

Jinko

Construction of the park started in August 2023. It options 131,000 bifacial monocrystalline panels, every with a capability of 615 W, and is deliberate to generate 188 GWh per yr.

Located 40 kilometers from Santiago, the capital of Chile, Don Humberto park has an space of ​​186.75 hectares. The undertaking obtained environmental approval in April 2022.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

FOLLOW US

0FansLike
0FollowersFollow
0SubscribersSubscribe
spot_img

Related Stories