From pv journal in France
French panel maker Carbon mentioned it would construct a brand new R&D heart in Istres, within the Bouches-du-Rhône division in southern France. The location shouldn’t be removed from the deliberate module manufacturing unit in Fos-sur-Mer.
From 2027, the laboratory will embody technical platforms and working tools to allow the rise in manufacturing. The web site can even host a “photo voltaic campus,” in addition to a documentation and coaching heart.
The property consists of a number of vacant industrial buildings, which can be renovated. The challenge, with not less than €33 million ($35.4 million) funding in a number of phases, advantages from the assist of the French authorities by means of the France 2030 program. Carbon mentioned it would create 200 jobs within the metropolitan space, plus 3,000 on the gigafactory in Fos-sur-Mer.
Carbon mentioned it plans to spend 3% of its turnover on R&D. The objective is to place itself in the beginning of the advertising and marketing of tunnel oxide passivated contact (TOPCon) cells and modules, whereas additionally growing TOPCon back-contact (TBC) cell expertise, in addition to disruptive applied sciences corresponding to perovskites.
In May, Carbon revealed plans to start pilot manufacturing at its vertically built-in TOPCon and IBC photo voltaic module manufacturing unit in Fos-sur-Mer in fall 2025. The manufacturing unit will use a 500 MW pilot manufacturing line for TOPCon panels. The firm says it would initially produce modules with cells sourced in Europe or from different continents.
Popular content material
The firm mentioned the manufacturing unit has 5 GW of annual ingot and cell manufacturing capability and three.5 GW of module capability.
This content material is protected by copyright and might not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].