Tuesday, October 22, 2024

Trina Solar Japan Energy Agri-PV challenge reaches industrial operation

-


Trina Solar Japan Energy (TSJE), the Japan regional group of Trinasolar ISBU (International System Business Unit), introduced that its giant 2.34MWp Agri-PV challenge in Fukuchiyama has entered industrial operation.

The industrial operation ceremony was attended by main challenge stakeholders, together with Feng Chen, TSJE consultant director, Masahiro Shimomura, president and COO of NCR Services Japan, the EPC contractor, and Koji Ogino, president of Yakuno agricultural promotion company.

The challenge began building in October 2023 and deploys Trina 210 N-Type 690W modules with unique rectangular cell expertise to extend buyer worth by excessive energy, excessive effectivity, excessive reliability, excessive capability and low energy prices. It will produce an annual 2700 MWh of unpolluted power, eliminating 1760 tons of carbon dioxide.

As a significant Agri-PV challenge, the plant marks a brand new milestone for the Trinasolar ISBU group within the Japanese market. Solar sharing optimizes using agricultural land by enabling simultaneous crop manufacturing and power technology in the identical house, selling sustainable land practices, with Trinasolar adopting an modern “PV+ ” mannequin to advertise inexperienced upgrading of agriculture, forestry, animal husbandry and fisheries.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

FOLLOW US

0FansLike
0FollowersFollow
0SubscribersSubscribe
spot_img

Related Stories