From pv journal Latam
The Spanish firm Solarpack introduced the official connection to the grid of the 144 MW La Unión photo voltaic plant, positioned within the municipality of Montería, positioned within the division of Córdoba.
The undertaking requires an funding of $ 100 million, based on Solarpack. During the development of the photo voltaic park, 1,276 jobs have been created, “a lot of which have been crammed by native employees,” the corporate added.
IDB Invest, the personal sector arm of the Inter-American Development Bank (IDB), and Bancolombia introduced in 2022 that they’ll present a complete of $134.5 million in financing for 2 Solarpack photo voltaic initiatives in Colombia, La Unión and the 108 MW La Mata. La Gloria is a municipality within the division of Cesar and the division of Cesar.
Solarpack is likely one of the firms awarded initiatives within the final long-term renewable power public sale in Colombia for a complete of 1,123 MWh/day, the place 15-year contracts have been closed with a weighted common worth at an allocation of COP 155.8/kWh ($0.041/ kWh).
This content material is protected by copyright and is probably not reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].