The Alhendín park joins a second facility in Garena, close to Seville, 180 miles away. Scheduled to be accomplished in 2025, the capability of the Gerena park is predicted to be round 60MWp.
“The completion of the Alhendín photo voltaic park and its connection to the Spanish electrical energy grid is a good achievement, permitting VELUX to satisfy its renewable electrical energy targets,” stated Kim Jonas, Energy and Climate Director at The VELUX Group.
“The agriculture and biodiversity parts of the venture match effectively with our twin give attention to local weather motion and biodiversity growth. In collaboration with BayWa re, we at the moment are implementing the idea of Solar Plant Symbiosis, which seeks to combine photo voltaic parks with nature and communities for mutual profit.”