TotalEnergies Uganda is accepting expressions of curiosity from firms for an EPC contract in relation to a 15 MW ground-mounted photo voltaic plant close to Lake Albert, west. Uganda.
The photo voltaic plant is a turnkey set up that can help future oil manufacturing by means of the Tilenga Project. TotalEnergies Uganda is serving because the challenge lead for the event of six oil fields within the Lake Albert area.
Interested contractors ought to submit e-mail requests for the pre-qualification questionnaire by June 7. To obtain questions, candidates should meet a set of minimal necessities, that are listed in full at tender doc.
Uganda has deployed 95 MW of photo voltaic by the top of 2023, in keeping with figures from the International Renewable Energy Agency (IRENA).
Earlier this yr, Uganda’s Ministry of Water and Environment launched a consulting tender for the Electricity Access Scale-up Project, a five-year initiative to construct 40 photo voltaic provide packages throughout Uganda.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].