A young has opened looking for consulting companies for a 6.13 MW solar energy plant within the village of Sartichala, within the district of Gardabani in japanese Georgia. Tbilisi-based JSC Georgian Oil and Gas Corp plans to construct and function the plant, with funding from German state-owned funding and improvement financial institution KfW.

The chosen advisor will put together a feasibility examine and technical specs as much as the extent of preliminary design documentation. A timeline of six months was given for the contract.

According to the tender doc, consulting firms with expertise within the Albanian area, Bosnia and Herzegovina, Montenegro, North Macedonia, Serbia, Kosovo, Croatia, Slovenia, Ukraine, Georgia and Armenia are most popular.

The deadline for purposes is June 10, with the award of the contract presently scheduled for the top of the third quarter of this 12 months.

According to figures from the International Renewable Energy Agency (IRENA), Georgia has deployed 58 MW of photo voltaic by the top of 2023, up from 23 MW by the top of final 12 months.

This content material is protected by copyright and is probably not reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].