Friday, October 11, 2024

JinkoSolar studies hearth at PV module manufacturing unit in China – pv journal International

-


Chinese module maker JinkoSolar says a hearth broke out at its built-in module manufacturing facility in Taiyuan, Shanxi province in China. It mentioned the incident might have an effect on the 2024 annual outcomes.

On the afternoon of April 26, a hearth broke out at JinkoSolar’s Integration Factory in Taiyuan, Shanxi Province. Following a name from an area media outlet to the hearth brigade in Xiaodian District, Taiyuan City, it’s reported that efforts to reply to the incident are ongoing. Next, the native Emergency Management Agency confirmed that the hearth began at 15:07 within the afternoon of the twenty sixth and was efficiently extinguished at 17:00, with no reported casualties or people trapped. There had been no incidents of poisonous gasoline leaks or explosions.

Despite preliminary containment, the hearth flared up once more and grew in depth. To include the rising flames, the native hearth division mobilized a big fleet of firefighting automobiles from a number of departments, which continued their efforts till previous midnight. Unconfirmed studies circulating on native social media counsel that the affected space inside the plant is especially centered on the photo voltaic cell workshop of the primary section of the challenge, leading to intensive harm.

Two days later, on the night of April 28, JinkoSolar launched a press release titled “Announcement Regarding Fire Accident at Wholly Owned Subsidiary,” which confirmed that there was a hearth at round 3:00 pm on April 26 on the wafer chopping and photo voltaic cell workshop within the first section of its wholly owned subsidiary, Shanxi JinkoSolar II Intelligent Manufacturing Co. While the extent of the harm continues to be being assessed, JinkoSolar expects it to have an effect on its 2024 annual outcomes. The firm promotes property insurance coverage protection for plant property and notifies the insurance coverage supplier because the declare course of begins. In addition, JinkoSolar is taking a look at lowering manufacturing capability and rising capability at its Shanxi base as a result of incident.

The hearth incident occurred at JinkoSolar’s bold “56GW annual manufacturing capability vertically built-in manufacturing base” situated in Taiyuan, Shanxi Province. This challenge, with a complete deliberate funding of CNY56 billion, goals to construct a complete industrial chain in 4 phases, protecting 56GW of annual manufacturing capability for monocrystalline ingots, wafers , photo voltaic cells, and PV modules.

On March 26 this yr, JinkoSolar introduced the completion of the primary section of the 14GW built-in manufacturing capability and the beginning of manufacturing. Before the hearth, all manufacturing traces had been within the course of of accelerating capability.

This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

FOLLOW US

0FansLike
0FollowersFollow
0SubscribersSubscribe
spot_img

Related Stories