Started by the Yap State Public Service Corp. a young for the availability and supply of interconnected photo voltaic minigrids with BESS to Yap Island, Micronesia.

The chosen contractor will signal an settlement with the utility firm, which is answerable for the tender, to provide tools that can make up the 2 photo voltaic minigrid tasks on the island. The minigrid techniques have a mixed capability of 79 kW.

Interested bidders are requested to submit particulars of their technical and monetary gives in compliance with the technical specs of the tender doc, along with statements of ensures for the long run PV tools. Bids should be obtained by publish by January 28, 2025.

Figures from the International Renewable Energy Agency present that Micronesia could have deployed 3 MW of photo voltaic by the top of 2023.

This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.

Popular content material