From ESS News

The Greek authorities on Friday printed particulars of the nation’s third standalone, grid-scale, front-of-the-meter battery power storage public sale.

The public sale seeks 200 MW of battery storage capability, 100 MW lower than what was initially sought when the subsidy program for the sort of power storage was introduced.

The public sale should be accomplished by December 15, 2024 and the awarded initiatives should be linked to the grid by April 30, 2026, in keeping with the discover launched within the official authorities gazette.

To proceed studying, please go to our ESS News web site.

This content material is protected by copyright and will not be reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].

Popular content material