From pv journal ESS News

Dutch power storage developer Giga Storage and grid operator TenneT have concluded the primary time-based connection and transmission settlement within the Netherlands, in a bid to make sure extra environment friendly use of the present electrical energy grid.

The new sort of contract, developed as a part of the National Grid Congestion Action Programme, permits Giga Storage to attach its battery undertaking – Giga Leopard, with an influence output of 300 MW and a storage capability of as much as 1,200 MWh – to the electrical energy grid in Delfzijl.

Under the deal, Giga Storage has the precise to take electrical energy from the grid or feed it again at the very least 85% of the time. Thus, it’s going to assist the grid operator in relieving congestion by not charging or discharging the grid battery at sure occasions.

To proceed studying, please go to our pv journal ESS News web site.

This content material is protected by copyright and is probably not reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: editors@pv-magazine.com.

Popular content material