[ad_1]
Photo: Tajikistan Ministry of Economic Development and Trade
Eging PV Technology is ready to construct a 200 MW photo voltaic facility within the Panj Free Economic Zone in Khatlon province, Tajikistan.
Construction is scheduled to start in July, with the primary of 4 phases deliberate to be accomplished by March 2025. The preliminary manufacturing capability of the plant is predicted to face at 5,000 MW, in keeping with a press release from the presidential press service . When absolutely operational, it is going to present 8,000 jobs, with 95% allotted to Tajik residents.
In October 2023, plans had been introduced for 500 MW of renewables in Tajikistan, together with floating PV installations. The nation has set a goal to generate 1 GW of power from renewable sources by 2030.
According to the International Renewable Energy Agency (IRENA), Tajikistan is not going to have any put in PV capability by the tip of 2023.
This content material is protected by copyright and is probably not reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: editors@pv-magazine.com.
[ad_2]
Source link