CNOOC revealed the outcomes of the most recent centralized procurement tender for n-type photo voltaic modules. Yingli obtained the primary successful bidder qualification with a unit worth bid of CNY 0.84 ($0.12)/W, adopted by Trina Solar and Das Solar. The complete bids reached 790 MW, solely for the 580 W n-type monocrystalline bifacial modules.

GCL Perovskite started constructing a gigawatt-scale, large-scale industrial perovskite module manufacturing base in Kunshan, Jiangsu province. The manufacturing base will deal with the manufacturing of large-scale industrial perovskite tandem modules with an space of ​​2.88 sq. meters (1.2 meters x 2.4 meters) – at the moment the biggest perovskite modules on the planet, with the very best conversion effectivity. The CNY 570 million challenge shall be applied in two phases, with the primary section protecting a building space of ​​120,000 sq. meters.

This content material is protected by copyright and will not be reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].