Wednesday, July 8, 2026

SJVN secures 2.4 GW pumped storage undertaking in India – pv journal Worldwide

-

[ad_1]

From pv journal India

SJVN has signed a letter of intent for the development of a 2.4 GW pumped storage undertaking from the Indian state authorities of Mizoram. The pumped storage undertaking is proposed throughout the Darzo Nallah, a tributary of the Tuupui River.

This is the primary undertaking of SJVN within the state of Mizoram. It is an on-stream closed-loop sort and consists of eight models of 300 MW every.

“Annual power era with 95% plant availability ought to be 4,993.20 MU. Annual power enter required for pumping water to the floor reservoir is estimated to be 6,331.66 MU with 95% plant availability ,” mentioned SJVN.

The undertaking is deliberate to be accomplished in 72 months. The closing settlement between the SJVN and the Mizoram authorities ought to be signed inside three months.

This content material is protected by copyright and might not be reused. If you need to cooperate with us and need to reuse a few of our content material, please contact: [email protected].

Popular content material

[ad_2]

Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here

FOLLOW US

0FansLike
0FollowersFollow
0SubscribersSubscribe
spot_img

Related Stories