Proposals acquired for the event of 800 MW of grid-connected photo voltaic in Nepal correspond to greater than 4 instances the accessible capability beneath tender, in response to new figures from the NEA.

The state-owned utility ran the tender earlier this yr. It is claimed to have acquired proposals from 134 corporations in complete for a mixed 3.6 GW.

The NEA revealed an inventory of 259 tasks from 127 builders that handed the technical bid analysis, representing a mixed 3,492.5 MW. Financial proposals for these bids might be opened on October 22.

Projects chosen for growth will enter into energy buy agreements with NEA for 25 years. The remaining selection will rely on the substation and value, with the utility setting a value ceiling of NPR 5.94 ($0.04) per unit.

Nepal may have 115 MW of put in photo voltaic by the tip of 2023, in response to figures from the International Renewable Energy Agency (IRENA).

This content material is protected by copyright and will not be reused. If you wish to cooperate with us and wish to reuse a few of our content material, please contact: [email protected].

Popular content material